Terminal 2E Electrical Modernization

BSE scope included 12kV infrastructure, 480V re-feeds, HVAC, plumbing, and construction phasing for the Terminal 2E Main Switchboard Replacement at the San Diego International Airport. The project consisted of the replacement of the single-ended main switchboard with a new Main-Tie-Main switchboard served by two (2) exterior pad-mounted 12kv-480/277V transformers. BSE worked with the SDIA to develop and detail nine (9) construction phases as part of the construction documents to minimize impact to the airport operations.

Location: San Diego, CA
Year: 2022
Services: Electrical Engineering
Owner: San Diego County Regional Airport Authority