NAWS China Lake High Voltage (HV) Electrical System Study

Prime consultant, Electrical engineering study analyzed and documented all 34.5kV and 4.8kV primary voltage overhead and underground electrical circuits. Created as-built documentation and provided list of deficiencies and recommended upgrades along with construction cost estimates. Performed a complete Power System Study (short circuit analysis, protective device coordination, and arc flash analysis) for entire primary electrical systems.

Location: China Lake, CA
Year: 2017
Services: Prime Consultant, Electrical Engineering
Owner: NAVFAC Southwest