North Bay Intake Pump Station Replacement

Electrical and Process & Instrumentation Controls engineering for the project that included new intake structures, delivery piping, and a below-grade pump station to pump water to the Bernina Water Treatment Plant. The new Pump Station included 3-40HP intake pumps (located in lake), 3-200HP booster pumps, new service entrance motor control center (MCC) w/VFD motor starters, connection point for 800kW portable generator, and new controls with HMI display, PLC, and SCADA system.  BSE also provided lighting and power for a new electrical building.

Location: Lake Arrowhead, CA
Year: 2021
Services: Electrical and Process & Instrumentation Controls Engineering
Owner: Lake Arrowhead Community Services District
Awards: 2019 APWA Engineering Excellence Commendation

Scroll to Top